LED 4 Crops LED Facility Build Update 27/4/12

Earlier this week, the final few panels of the insulated outer shell were installed and the structure of the building is now completed.  The air conditioning for the building is currently being installed.
The next stage is lighting installations. Examples of the three main lighting rigs have been brought to the site and installed temporarily (see photo’s below).  The full lighting rigs will be delivered for installation in the next 2-3 weeks.
Below are a selection of photos showing the facility in its current form and what it used to look like when it was just a glasshouse.
Before

During Air conditioning installation

Pictures from our recent stewardship meeting including examples of the lighting rigs